Henstridge, Somerset - New Build Industrial Cladding & Roof System
A complete new build cladding and roof system for an industrial unit in Henstridge, Somerset — featuring 14-metre Tata Trisomet 333 panels lifted by 100-tonne crane, delivered across 1,850 m² of roof and 1,000 m² of elevations over eight weeks.
PROJECT OVERVIEW
Henstridge, Somerset
New Build Industrial Cladding & Roof System — Henstridge, Somerset, 2023
Tekclad delivered a complete new build industrial cladding and roof system for an industrial unit in Henstridge, Somerset. Installed across 1,850 m² of roof and 1,000 m² of elevations, the envelope features 14-metre long Tata Trisomet 333 composite panels — lifted into place using a 100-tonne crane and vacuum lifter — with the office area finished in Tata Trimapanel. The eight-week programme was delivered in close collaboration with the architect and steelwork contractor.
THE BRIEF
Tekclad was recommended to the self-building contractor by a long-standing steelwork partner. The brief was to deliver a complete external cladding and roofing envelope for a new build industrial unit at Henstridge — with the design demanding a clean junction between micro-rib and profiled elevation systems, and large-span roof panels installed safely and at pace.
The Challenge
The headline technical challenge was the installation of 14-metre long Tata Trisomet 333 roof panels — substantially longer than standard. These were lifted into position using a 100-tonne crane fitted with a vacuum lifter, allowing safe, controlled placement of each panel with minimal disruption to the steel frame below.
A second technical detail was the junction between the micro-rib and profiled elevation systems, which required careful coordination to deliver a clean, weathertight transition. Both challenges were resolved without programme impact.
Scope of Works
A complete external envelope across 1,850 m² of roof and 1,000 m² of elevations, delivered over an eight-week programme in close collaboration with the architect and steelwork contractor.
Materials & Specification
- Tata Trisomet 333 composite panels — roof and elevations
- Tata Trimapanel — office area elevations
- Filon rooflights
- Stainless steel fixings throughout
- 14-metre long roof panels lifted using a 100-tonne crane and vacuum lifter
The Outcome
The completed unit was handed over to a satisfied client, with the incoming tenant equally pleased with the finished result. The combination of Tata Trisomet 333 roof and elevation panels, Trimapanel office cladding, and Filon rooflights delivers a high-performance, energy-efficient industrial envelope — while the clean detailing between the micro-rib and profiled systems gives the building a sharp, modern finish fit for long-term commercial use.
PROJECT DETAILS
LOCATION
Henstridge, Somerset
PROJECT TYPE
New Build — industrial cladding & roof system
ROOF AREA
1,850 m²
ELEVATIONS
1,000 m²
PROJECT VALUE
£230,000 (2023)
DURATION
8 weeks
MAIN MATERIAL
Tata Trisomet 333 & Trimapanel
Have a similar project? Get a free, no-obligation quotation from our team.