Refurbishment and New Build · Somerset

Tapstone Road, Chard

A tired industrial plot turned into a contemporary commercial hub, with the complete building envelope across two buildings delivered by Tek Clad Ltd.

Roofing and cladding
c. 3,230 m²
Buildings
Two
Handed over
April 2025

The project

A two-phase redevelopment for Viabill Ltd that has turned a tired industrial plot on Tapstone Road into a cohesive, contemporary commercial hub.

We were appointed to deliver the complete building envelope package, some 3,230 m² of roofing and wall cladding across two separate buildings.

Phase One was the refurbishment of an existing factory building, retaining two original external walls: 600 m² of new vertical wall cladding and 1,800 m² of roofing panels. Phase Two was a new standalone retail building, with 430 m² of vertical cladding and 400 m² of roofing in a matching material palette for consistency across the site.

  • Two PhasesA refurbished factory and a new retail building.
  • Two SystemsKingspan KS1000RW vertical and KS1000MR horizontal.
  • 15% Roof LightsRoof lights across 15% of the roof area for natural daylight.
Aerial view of the completed buildings at Tapstone Road, Chard

Scope and specification

Phase One
1,800 m² roof
600 m² walls
Phase Two
400 m² roof
430 m² walls
Wall systems
Kingspan KS1000RW
and KS1000MR
Roof lights
15% of roof area
  • High-performance insulated Kingspan panels
  • Custom wide flashings to out-of-square walls
  • Matching material palette across both buildings
  • Worked alongside steel fabricators, architects, roof netters and scaffolders
Long elevation of the refurbished factory building

The challenge

Walls up to 200mm out of square

Retaining original parts of the Phase One structure meant installing cladding against walls up to 200mm out of square. We used custom wide flashings, fitted to the widest point of each discrepancy, to deliver a clean, professional finish.

The buildings also combine two cladding systems, Kingspan KS1000RW installed vertically and KS1000MR installed horizontally, which took careful detailing and coordination to keep clean lines, panel alignment and architectural consistency.

On site

From steel frame to envelope

Scope finalised in September 2024, with the full project handed over by April 2025.

The result

A transformed site

Energy efficiency was a priority across both buildings. High-performance insulated panels give excellent thermal performance for long-term sustainability and lower running costs, and the roof lights bring in natural daylight.

"Tek Clad played an important role in the success of the Tapstone Road development. From the outset, they were straightforward, responsive, and easy to work with. Their team handled the technical challenges on-site professionally and made sure the project kept moving without delays. The quality of the finished work speaks for itself, and the site has been transformed into a space that will benefit the local area for years to come. I'd be happy to recommend Tek Clad Ltd based on our experience."

Viabill Ltd
Discuss a similar project
Glazed frontage of the new retail building

Completed

The finished buildings

Accredited, approved and audited

  • NFRC
  • RIDBA
  • Constructionline Gold
  • SafeContractor
  • Euroclad
  • Tata Steel
  • Filon
  • Joris Ide
  • PowellGee
  • Kingspan
  • Brett Martin

Get in touch

Request a survey

Working on something similar? Send us the building, the problem and the programme. We survey, price and deliver.

Telephone
01305 770433
Address
Unit 5 The Old Slaughterhouse
Green Lane, Chickerell
Weymouth, Dorset DT3 4GG