Refurbishment · Hertfordshire
Stevenage
A nearly new building whose roof had leaked from day one, overclad by Tek Clad Ltd as principal contractor with the tenant in full operation.
- Programme
- Five weeks
- Roof
- c. 2,120 m²
- Warranty
- 25-year product
The project
A new building with a composite roof that had been installed incorrectly and leaked from day one. Many attempts to fix it had failed.
It shows what can go wrong when work is not installed correctly: the wrong contractor can mean a huge amount of extra cost, wasted time and pressure on everyone affected by the failures.
We worked directly for the architect, and as principal contractor we installed a complete overclad system on the nearly new building, to the specification and industry standards, in five weeks.
- Principal ContractorWe organised all works, including scaffolding and netting.
- Tenant in PlaceThe business stayed in full operation throughout.
- 25-Year WarrantyEuroclad Refresh system with a 25-year product warranty.

Scope and specification
- Roof
- c. 2,120 m²
overclad - System
- Euroclad Refresh
- Flashings
- HPS200 Ultra
coated steel - Warranty
- 25-year
product warranty
- Composite metal roof system to current Building Regulations
- Heras fencing around all four elevations and a site compound
- Welfare unit and site office on site
- Lifting with our own 30m rotating telehandler

The challenge
A tenant in full operation
All the work had to be done with the tenant in place and their business in full operation. As principal contractor, we prepared a construction phase plan that catered for everyone on site, and oversaw and organised all the works, including access scaffolding and roof safety netting.
Scaffolding went up and came down over weekends to work around the tenant. Our site and team managers ran the job, and all lifting was done with our own 30m rotating telehandler.
On site
Five weeks on the roof
Insulation going down over the old roof, new sheets and the finished eaves trims.



The result
Leak free, at last
The building now has a leak-free roof with a 25-year material warranty. The project was completed without issue, and the site was handed back spotless on handover day.
Discuss a similar project"Tek Clad undertook an over-cladding project which I had managed in Stevenage. The project was seamless, professional and prompt. Ian (the Director) regularly attended site and ensured that the works were undertaken safely. In addition, the tenant of the building remained in occupation and operation throughout the works, and were also very happy with the results. Top job, and I would certainly recommend them for any cladding project."

Completed
The finished roof



Accredited, approved and audited
Get in touch
Request a survey
Working on something similar? Send us the building, the problem and the programme. We survey, price and deliver.
- Telephone
- 01305 770433
- [email protected]
- Address
- Unit 5 The Old Slaughterhouse
Green Lane, Chickerell
Weymouth, Dorset DT3 4GG