Refurbishment · Somerset
Cadbury Building A, Sparkford
A failing early 1990s twin skin roof overclad with a complete insulated system, giving a long-term, energy-efficient solution for an industrial unit.
- Programme
- Three weeks
- Roof
- c. 1,200 m²
- Completed
- 2025
The project
An early 1990s industrial unit at Cadbury Business Park, with a twin skin metal roof suffering from plastisol failure, corrosion and water ingress.
We have a long-standing relationship with this client, having delivered and maintained numerous projects for them over many years. On this roof we had carried out patch repairs and maintenance throughout its service life, but with ongoing failures and the roof at the end of its lifespan, a full refurbishment was needed.
We installed a complete overclad system that complies with current building regulations, in three weeks.
- OvercladA complete new roof built over the existing one.
- 200mm InsulationGlass fibre insulation to current building regulations.
- Repeat ClientNumerous projects for this client over many years.

Scope and specification
- Roof
- c. 1,200 m²
overclad - Roof sheets
- 0.7mm trapezoidal
plastisol coated LG - Insulation
- 200mm
glass fibre - Gutter linings
- Plygene
by HD Sharman
- Spacer bar system over the existing roof
- Matching plastisol coated steel flashings
- Complies with current building regulations
- Scaffolding and roof safety netting

The challenge
Draining into the existing gutters
The main challenge was creating a suitable detail for the new roof to drain into the building's existing gutters, which were lined with Plygene as part of the works.
Otherwise the job ran without complications, from scaffolding and netting through to the finished roof.
Before and after
Three weeks on the roof
The worn original roof, new sheets lifted into place, and the finished valley detail.



The result
Another successful project
The refurbished roof gives this industrial unit an energy-efficient, long-term solution, and another successful project for Cadbury Business Park.
Discuss a similar project"We've used Tek Clad Ltd for a number of years now covering a range of projects including large new builds (up to 26,500 sq/ft) and refurbishments (including asbestos removal), as well as smaller changes and maintenance. Typically the work is one of the big ticket items within a project and therefore it's key to have a company you can rely on to deliver to time and cost whilst working seamlessly with others and helping to resolve any issues as they occur. What keeps us coming back to Ian and his team is the level of service, quality, professionalism and overall can do approach they bring to their work."

Accredited, approved and audited
Get in touch
Request a survey
Working on something similar? Send us the building, the problem and the programme. We survey, price and deliver.
- Telephone
- 01305 770433
- [email protected]
- Address
- Unit 5 The Old Slaughterhouse
Green Lane, Chickerell
Weymouth, Dorset DT3 4GG